We are going to open the blast furnace.
By opening the furnace, we are going to have pig iron, our product. “In March next year, we are going to open the steel mill.
In June or July next year, we will have steel from Manhize.
Zimbabwe will no longer need to import.
We will have enough to meet the local demand,” he said.
Last year, the firm inked a deal with power utility, Zesa Holdings, to construct a 100 kilometre powerline linking the operation to the national grid. 🔗 Read Full Article
All Zim News is a central hub for all things Zimbabwean, curating news from across the country so no story is missed.
Alongside aggregation, our team of nationwide reporters provides real-time, on-the-ground coverage.
Stay informed and connected — reach us at admin@allzimnews. com.