A giraffe near the Skukuza Rest Camp. Picture: SANParks The situation at the Kruger National Park has improved, but not all areas of the park are fully accessible. South African National Parks (SANParks) provided an update on Wednesday, announcing the reopening of one of the key gates near Komatipoort.
River levels have dropped in most areas in the park. However, the northern areas have yet to welcome back visitors. The easing of weather conditions has allowed for the scheduled reopening of the Crocodile Bridge gate.
The Crocodile Bridge gate will be open to day visitors from Thursday, 22 January, with the possibility that it could be closed at short notice. SANParks said that the wall of a dam near the park’s perimeter had reportedly been compromised, which may affect access through the Crocodile Bridge gate. The Paul Kruger, Numbi and Malelane gates are all open.
Read Full Article on The Citizen
[paywall]
However, a park-wide visitor quota remains in place. The Phabeni Gate remains closed due to a section of the road linking it to Skukuza having washed away earlier in the week. Satara Rest Camp, Tshokwane Picnic Site and the northern areas of the Kruger National Park remain inaccessible as access points between the north and south of the park are obstructed. WATCH: Vehicles ready to guide tourists through the Kruger National Park Damage assessments across the vast nature reserve are still underway and SANParks has warned that conditions are constantly evolving.
[/paywall]