Zimbabwe News Update

🇿🇼 Published: 05 January 2026
📘 Source: TimesLIVE

The third and final phase of Rand Water’s maintenance is scheduled from January 6 to 8. The 54-hour maintenance at the Eikenhof pump station is part of essential upgrades to critical bulk water infrastructure needed to enhance long-term reliability, the city of Johannesburg said. Water supply disruptions are expected in some areas: “During maintenance, the volume of bulk water supplied to Johannesburg Water’s network will be significantly reduced.

As a result, affected reservoirs will gradually deplete, and residents may experience low water pressure or outages,” the city said. “After maintenance ends and pumping resumes on January 8, systems will not recover immediately. Johannesburg Water’s infrastructure will require at least seven days to stabilise and recover fully.” Operational and contingency plans to reduce the effects of the maintenance are being implemented. “Reservoir levels have been managed in advance, response teams are on standby, and alternative water will be supplied to affected communities through stationary and roaming tankers during the maintenance and recovery periods.”

📖 Continue Reading
This is a preview of the full article. To read the complete story, click the button below.

Read Full Article on TimesLIVE

AllZimNews aggregates content from various trusted sources to keep you informed.

📰 Article Attribution
Originally published by TimesLIVE • January 05, 2026

Powered by
AllZimNews

By Hope